Composite manufacturing software and MRP for make-to-order carbon fibre and composite shops: quoting, autoclave scheduling and traceability, from the customer's drawing to the NCR and the invoice.






From a one-off prototype to a repeat batch of carbon parts, each job carries its own routing, costs and drawing. The routings below are typical; yours are set up the way your shop runs.
The ply kit is a part you make. A Make line raises its own kit-cutting sub-works order, numbered under the job it's for.
Tools quoted as a project on a budget figure, with the detail added as the design firms up, then delivered and invoiced in stages.
Bodywork and aero parts with lacquer or paint sent out on a purchase order linked to the works order it's for.
Carbon and metal parts bonded in a jig. The customer's drawing travels with the job and opens on the shop floor tablet at the bench.
Covers, housings and panels made again and again. Find the last job by its UPR and re-quote it at today's prices.
Closed-mould and infused parts. Each operation is costed once for its setup, then per part at the hourly rate of the station doing it.
Development parts where the process changes as you go. Add operations to the works order and put them in order without changing the quoted costs.
Development parts where the process changes as you go. Add operations to the works order and put them in order without changing the quoted costs.
Five places a carbon part or a mould tool usually goes wrong, each answered by the part of Statii that handles it. Shown with composites data.
Lay-up, bagging, the cure, trimming and inspection each go on the costing against the bay, autoclave or booth that does them, with a setup time and a time per part at its hourly rate. The ply kit goes on as a part you make; inserts and lacquer go on as bought-in costs. Attach the customer's drawing; it stays with the job.
Time booked against each operation posts back to the job as it's worked. On the works order, actual time and cost turn red once they pass the plan; on the sales order, Estimated, Planned and Actual margin sit side by side, so a price that was too low shows before the repeat order comes in.
Buy prepreg by the roll and cost it by the part: the item's buy line converts the roll into the unit you cost in. Finishing sent out is a bought-in cost on the quote; when the customer's order is acknowledged it becomes a purchase order, prefilled and linked to the works order and sales order, ready to check and send.
Each lay-up bay, autoclave, oven and trim booth is a resource with its own working hours, so the autoclave can run longer than the shop. Autoplan works back from the date the customer needs the job and fits each operation round what's already booked. An operation expected after the required date shows red.
Operators open the works order on the shop floor tablet, clock on to the operation they're doing and open the drawing from View Attachments. Each booking lands on the works order with the operator's name, the date and time, and the time booked against the job.
“We couldn't live without the quality module now.”
Founded in Warwick by two ex-Formula 1 composite technicians, MV Composites makes prepreg carbon components and mould tools. Quality moved out of spreadsheets and into Statii, so NCRs run through the same system as the jobs, for the ISO 9001 accreditation they hold.
"A comprehensive MRP system that enabled us to move away from relying on multiple Excel spreadsheet."
"Value for money is superb, sees the job all they way through from quoting to invoicing all linked together."
"Implementing Statii in our business has been very straight forward & the support from the Statii team has been great every step of the journey"
Composite parts for motorsport and automotive customers often ship with a material cert, an inspection report and a CofC. Statii keeps each one attached to the record it belongs to, and every change to the job as a revision.
Attach the material certificate to the batch of prepreg it came with. A works order can't go ahead until its batch is allocated, and any batch traces to the job and customer it went to.
Attach scan reports, inspection sheets and the customer's drawing to the works order. Any document type, opened from the shop floor tablet.
Change a quote, sales order or works order — a new drawing, a new lay-up — and it's saved as a new revision. Earlier revisions open from the record and download as a PDF.
Raise an NCR and quarantine the stock it affects. Rejected parts are recorded at the operation, and the rework's cost goes to the original sales order.
Customers are audited for ISO 9001 with Statii running. Statii keeps the records; your quality system does the certifying.
A carbon part or a mould tool runs through all six steps. Each one takes what it needs from the last, so nothing is typed twice.
Every stage inherits from the last. Nothing is re-keyed between them.
Anything else, ask the team who built it: 0115 647 2002
Yes, for make-to-order composite work: carbon fibre and GRP parts, mould tools and bonded assemblies made to the customer's drawing, as one-offs, prototypes and repeat batches. One system takes the job from quote to sales order, works order, purchase orders for bought-in parts and finishing, the schedule for each bay and autoclave, shop floor bookings, delivery and invoice. Invoices sync with Xero, Sage or QuickBooks.
Yes, as a resource with its own working hours, so it can run longer than the rest of the shop. Autoplan fits each job's cure round what's already booked, and each cure takes its own slot on the autoclave. When several jobs go into one cure, the operator books it once on the shop floor tablet with split booking and the time is shared between them. Statii doesn't capture cure cycles or autoclave data.
Yes. The prepreg's buy line converts the roll you buy into the unit you cost in, such as square metres. Make the ply kit an item of its own, costed with its prepreg and kit cutting, and each part's costing takes the kits it needs. How much prepreg a kit uses is your own figure: Statii doesn't nest kits or build ply books.
Yes. Start the quote with a budget figure, attach your estimate, and add the detail as the design firms up. On the sales order, works orders are completed by percentage, so the tool can be delivered and invoiced in stages.
Yes. Attach the material certificate to the batch. A works order can't go ahead until a batch is allocated to it, and any batch can be traced to the job and customer it went to. If a batch is suspect, raise an NCR and quarantine the stock. Statii doesn't track prepreg out-life or freezer time unless you set up custom fields for it.
It doesn't capture autoclave or cure-cycle data, build ply books or laminate schedules, nest ply kits or import CAD files. It doesn't count mould tool life or release cycles, connect to NDT equipment or scanning arms (inspection and scan reports attach as documents), keep resin mix batch records, or handle customer-owned moulds. Prepreg out-life is only tracked if you set up custom fields, and traceability goes to the batch, not to serial numbers. It doesn't monitor machines.
Three minutes, no sales call. Or ring us on 0115 647 2022 and ask anything.
No card required · UK-based support included